Sunday, February 15, 2009

Construction On Progress Energy Trail Underway

The Progress Energy Trail's wide asphalt path is being constructed in five stages. The first leg, completed last year, stretches about 2-1/2 miles from Belleair Road up to Bright House Networks Field. Running south from Belleair Road, the trail will cross U.S. 19 again, pass underneath Ulmerton Road, and link up with the Pinellas Trail system, a 70-mile bicycle trail looping all the way around Pinellas County. Heading north, it will follow the power line corridor to connect with a trail running alongside East Lake Road, which will link to a Pinellas Trail extension along Keystone Road. In Clearwater, the trail already connects to the Ream Wilson East-West Trail, which will one day stretch from the beach to Tampa Bay, Clearwater officials say. Much of that trail will eventually run alongside Druid Road.

Click here to enter the Tampa Realtors MLS (updated daily)
Register to receive an email every morning of today's new listings
Visit my website or contact me by email

0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home